Skip to content
☰
CASE STUDY • TATA STEEL

TATA Steel: Improving Material Replenishment Visibility

TATA Steel E-Kanban brings production requirements, stores activity and material replenishment into a more connected digital flow, helping teams follow material requirements from demand through availability and replenishment.

The case study focuses on connecting key stages of the material cycle — from production demand and stock checking to material fulfillment and replenishment follow-up.

01
PRODUCTION Requirement Raised
→
02
STORES Availability Checked
→
03
REPLENISHMENT Supply Follow-up
TATA STEEL E-Kanban case study

Material Request Visibility

Capture production material requirements digitally, giving stores teams a clear view of the items and quantities needed.

Stock Availability

Review material availability against incoming requests to help coordinate fulfilment based on production needs.

Replenishment Coordination

Keep unavailable material requirements visible for replenishment and follow-up instead of losing track of pending needs.

Request Tracking

Follow each material request from initial production demand through stores handling and replenishment status.

THE CHALLENGE & APPROACH

Connecting Production Demand with Store Operations

TATA Steel E-Kanban connects production requirements with stores visibility, stock availability and pending material needs, bringing these activities into one traceable material flow.

Operational Challenges

Production Demand Visibility

Production requirements need to be captured clearly so stores teams can understand what material is required and where it is needed.

Stock Availability Checks

Requested materials need to be checked against available stock before the fulfillment activity can proceed.

Handling Material Shortages

When requested material is unavailable, the requirement needs a clear path for replenishment and follow-up.

Production–Stores Coordination

Stores activity needs to remain aligned with production demand rather than being handled independently.

Replenishment Tracking

Pending requirements need to remain visible through the replenishment cycle until the required material becomes available.

Solution Approach

Centralized Material Requests

Production material requirements enter a common E-Kanban request flow, providing a clear starting point for the fulfillment process.

Availability-Based Fulfillment

Store teams can review material availability against the request before coordinating the required fulfillment.

Shortage-Based Replenishment

Materials that are not immediately available can move into a replenishment path linked to the original requirement.

Connected Request Tracking

The material requirement remains connected as it moves between production, stores fulfillment and replenishment activities.

Process Visibility

A connected workflow provides visibility across the material cycle from the initial requirement through replenishment.

HOW THE PROCESS WORKS

From Production Requirement to Material Availability

The process follows each material requirement through four connected stages, allowing the request to move from production demand to store handling and, where necessary, replenishment follow-up.

01
PRODUCTION

Requirement Identified

A material requirement is identified based on the production need and prepared for the next stage of the process.

02
E-KANBAN

Request Created

The requirement is entered into the E-Kanban process, creating a clear digital request for stores to review and act upon.

03
STORES

Availability & Fulfillment

Stores teams review the requested material, check availability and coordinate fulfillment against the production requirement.

04
FOLLOW-UP

Replenishment Follow-up

When material is not immediately available, the requirement continues into replenishment follow-up until availability is addressed.

CASE STUDY PROCESS FLOW
One connected path from demand to availability
01
Production Demand Material requirement identified
02
Digital Request Requirement entered into E-Kanban
03
Stock Check Availability reviewed by stores
04
Fulfillment Material coordinated for production
05
Replenishment Follow-up when material is unavailable
SOLUTION HIGHLIGHTS

What the E-Kanban Approach Brings Together

The approach connects the key activities involved in handling a material request, giving production and stores a common process to follow from requirement through follow-up.

THE APPROACH A connected process for managing material requests from production demand to stores action.
01

Clear Request Initiation

Production requirements enter a common request path, giving stores a clear starting point for reviewing the material need.

02

Availability-Based Action

Stores can review the requirement against available material and determine the appropriate action for the request.

03

Follow-up for Unavailable Material

When material is not available, the request can continue into the replenishment process rather than becoming disconnected from the original requirement.

TATA STEEL E-KANBAN CASE STUDY

Explore a More Connected Material Flow

See how SoftDesigners can help bring production and stores activities into a connected digital process.

SoftDesigners | Digital Manufacturing Solutions