Skip to content
☰
About Us
Our Clients
Our Partners
Awards
Video Gallery
Career
Case Study
Blogs
Schedule a Demo
Industries
Aerospace
Automotive
Chemical
Electronic
Oil and Gas
Shipbuilding
Construction
Food & Beverage
Warehouse
Cement Industry
Mining
Industrial Machinery
Solutions
Industry 4.0
›
Andon System
Digital Work Instruction
Production Monitor
E-Preventive
SPC
EHS System
›
Permit To Work
Incident Management
Near Miss
LOTO System
Risk Assessment
Visitor Management
Warehouse Management
›
Kanban
Traceability
Artificial Intelligence
›
AI in Manufacturing
Unsafe Act Detection
AI PPE Detection
EHS
Safety & Risk Management
›
Permit To Work
LOTO System
Risk Assessment
Audit Management
Inspection Management
Change Management
Incident & Observation
›
Safety Observation
Incident Management
Near Miss
Employee Monitoring
›
Visitor Management
Headcount
Sustainability
Training & MOM
›
Learning & Development
Minutes of Meeting
Safety Induction
EHS Pricing
ESG Reporting
Industry 4.0
AR-powered Andon
Production Monitoring
Digital Work Instruction
E-Kanban
Traceability
Facility Hub
Preventive Maintenance
SPC Software
AI
AI for Workplace Safety
PPE Detection
Document Analyzer
Request Demo
Work at Height Permit
(Authorization to Perform Work at Height)
Permit & Job Details
Company Name
Permit No
Department / Section
Date Issued
Valid From
Valid To
1. Work Description & Location
Exact Location of Work
Approximate Height of Work
Description of Work to be Performed
2. Personnel & Training
Work Supervisor
Name(s) of Work Crew
Are all workers trained for Work at Height?
Yes
No
3. Hazard Assessment & Control Measures
Please check all hazards identified and the corresponding control measures applied.
Fall from height
Falling objects
Unstable work surface
Adverse weather conditions (wind, rain)
Poor access or egress
Overhead power lines / obstructions
Equipment failure (ladder, scaffold)
Other:
Control Measures
Guardrails / handrails installed
Fall arrest system used (harness, lanyard)
Ladder secured and inspected
Scaffold inspected and tagged
Exclusion zone established below work area
Tools secured to prevent falling
Visual/physical barriers installed
Other:
4. Authorization
Permit Issuer Name
Signature
Date
Lead Worker Name
Signature
Date
5. Work Completion & Permit Handover
Completion Time
Date
Work area is clear of tools and materials
Yes
No
Permit Closed By Name
Signature
Date
Download as PDF